top of page

280-B Gannet Drive

Port Resources

  • The second building built at 280 Gannett Drive.

  • This development entailed permitting the first ever site plan in the then newly created Long Creek Watershed district. 

  • Extensive impervious surface collection and treatment of rainwater run off was required.

bottom of page